- UID
- 11745
- 帖子
- 14959
- 积分
- 26345
- 阅读权限
- 80
- 注册时间
- 2005-12-17
- 最后登录
- 2015-6-2
- 在线时间
- 12821 小时
|
1、大干五十天,确保合同工期兑现
50 days’ hard work to ensure the construction period.
2、抢时间,争速度,精心安装,创优质工程
Race against time, work faster, install carefully, to build high quality constructions.
3、生命至高无上,安全责任为天
Life is supreme,????????????
4、以人为本,安全第一
People foremost, Safety first
5、英格索兰(中国)工业设备制造有限公司吴江园区一期钢结构工程由厦门新长诚钢构浪板有限公司制作安装
Ingersoll Rand (China) Industrial Equipment Manufacturing Co.,Ltd(Wujiang New Campus Project—Phase 1)is being manufactured and installed by Xiamen New Changcheng Steel Engineering Co.,Ltd

[ 本帖最后由 u2-bono 于 2008-5-22 01:02 编辑 ] |
|